8 HOURS DELIVERY: PLAGIARISM FREE AND QUALITY WORK GUARANTEED.

Learning Goal: I’m working on a civil engineering project and need an explanatio

Learning Goal: I’m working on a civil engineering project and need an explanation and answer to help me learn.conduct a travel demand study for the Muscat region using a travel demand survey questionnaire. The team should perform a thorough literature review on travel demand survey covering the need for the survey, the data to be collected, preparation of a suitable questionnaire and methods of analysis.Attachments:–The word doc include all the project details -The 6 pdfs are journals for the literature review chapter 2(will uploaded after accept the qustion)- The excal doc provided include all data needed for chapter 4: data collection and analysis
Requirements: 2500   |   .doc file

Learning Goal: I’m working on a civil engineering project and need an explanatio

Learning Goal: I’m working on a civil engineering project and need an explanation and answer to help me learn.conduct a travel demand study for the Muscat region using a travel demand survey questionnaire. The team should perform a thorough literature review on travel demand survey covering the need for the survey, the data to be collected, preparation of a suitable questionnaire and methods of analysis.Attachments:–The word doc include all the project details -The 6 pdfs are journals for the literature review chapter 2(will uploaded after accept the qustion)- The excal doc provided include all data needed for chapter 4: data collection and analysis
Requirements: 2500

Learning Goal: I’m working on a civil engineering exercise and need an explanati

Learning Goal: I’m working on a civil engineering exercise and need an explanation and answer to help me learn. STRUCTURAL DESIGN FOR INFRASTRUCTURE An open rectangular concrete tank sits at ground level and must be designed to contain sludge to an operational depth 0.7m below the top of the walls. The internal dimensions of your tank are given in the table below. The base is 500mm deep and is assumed to provide a continuous edge restraint to the walls. The strength class of the concrete is C35/45 and cement containing 30% GGBS is specified. The tank will be poured in winter and formwork is not specified. Assume cover to reinforcement is 50mm. Your design must include: 1 . Structural design of the walls and base of the tank. 2. Check the adequacy of the wall reinforcement for early-age and long-term cracking. State all design assumptions that you make and reference all design formula. 3. Produce a neat hand drawn sketch of your tank to show dimensions and the required reinforcement. 4. Discuss the main issues relating to the construction of a liquid retaining tank such as the one you have designed, with particular emphasis on minimising crack formation (max 300 words)
Requirements: 300

The Brief A 3000 word report is to be prepared in the style of a working manual

The Brief
A 3000 word report is to be prepared in the style of a working manual which is related to a work-based situation demonstrating the application of an appropriate civil engineering management system for a project or operation.
The first step is to agree a context with the course tutor. This needs to be a construction or civil engineering activity which can clearly demonstrate the need for a formal systematic approach to deliver safety, quality, budget and scope.
 An essential introductory feature is a reflective analysis of the context by firstly describing the project or activity. Then, secondly, explaining the need for quality systems emphasising the benefits and possible shortcomings these quality systems. You should also compare a similar project or activity where these were successful.
 A portfolio is to be prepared which will have a section for each of the following aspects of civil engineering management:
o Section 1 Health Safety and Environmental Management
o Section 2 Quality Management System* (Technical Compliance)
o Section 3 Financial and Commercial Systems o
o Section 4 Human Resources Management
 A Conclusion that will identify a proposed document control system, indicate the overall benefits of using the manual and include a minimum of 3 suggested improvement areas for the situation
* Note that the Quality section will include the essential and important technical, project planning or operational procedures that relate to the context of the report.

my friend is looking for an engineering expert to complete the answer of the que

my friend is looking for an engineering expert to complete the answer of the questions provided. it has to be someone expert in the field of engineering to be able to answer the questions. please don’t choose just a researcher as if they don’t have the right knowledge they won’t know what to do. if you have an expert let them discuss the order with me before I place it.

Learning Goal: I’m working on a civil engineering multi-part question and need a

Learning Goal: I’m working on a civil engineering multi-part question and need an explanation and answer to help me learn.A 325 MW electric power plant (37.1% efficient) uses a distillate fuel oil (C11H18O1N0.025,
124,500 BTU/gal, and density 7 lb/gal). Combustion occurs with 50% excess air. Assume
65% of fuel nitrogen converts to NO, and that fuel NO is 40% of total NO (the remainder being
thermal NO). Calculate a) the NO concentration (ppm) in the exhaust gas (dry basis, ignore
water formed) and b) the production of NO (lb/hr). (25 points)I NEED THE ANSWER IN PPM AND LB/HR, I DO NOT WANT KW.
Requirements: Long and lengthy   |   .doc file

Learning Goal: I’m working on a civil engineering question and need an explanati

Learning Goal: I’m working on a civil engineering question and need an explanation and answer to help me learn.Please read the question carefully and do it according to the book chapter 17, you can do Gravity and Cantiliver walls. I attached an example with the solution but for different conditions, try to follow it and also follow the book. I can’t attach the book, this is the book you must usePrinciples of Foundation Engineering, 9th Edition, SI Edition by Braja M. Das Nagaratnam Sivakugan (z-lib.org).pdfyou can find it in (Libgen.is) website, please look at chapter 17 and do the same. Thanks
Requirements: simple

Learning Goal: I’m working on a civil engineering writing question and need an e

Learning Goal: I’m working on a civil engineering writing question and need an explanation and answer to help me learn.A portfolio of evidence is a collection of documents that you are required to compile to show competence against a set of learning outcomes and to an appropriate standard.In terms of how you do it:Select an area related to Highway Asset Management and COP26 as asked for in the brief.Think about the wide range of possible sources of evidence that you could bring togethere.g. the COP26 website, journal papers, professional body webpages, internet sources, tv, online magazines, youtube etc etc etc Then you have to present this evidence in a structured way.The simplest way is to make a structured listing of these sources.For example… a listing of websites that I can click on and see what evidence you have collected.That is the easiest way….But it has to be structured.Please do not list the first 50 websites you find in a Google search.